Build Better
Food Processing

Maple Leaf Foods

Brandon, MB

Overview

An addition to an operational pork processing plant priced at roughly $1,200 per square foot-built around live production without interrupting the line.

Challenges

Construction around an active, running plant; protecting food safety and sanitation during the work; and phasing access so production never stopped.

Wright CM's Role

Construction management and coordination around live operations-phasing, temporary partitions, off-hour work, and tight equipment and utility tie-ins.

Outcome

Capacity added with production continuity protected throughout, and food safety controls maintained during construction.

Let's talk

Have a project with constraints like these?

Book a 15-minute Fixed-Fee Feasibility call and we'll surface the biggest cost, schedule, and operational risks early.

Schedule a Call